Now Reading
Environmental Assessment Bulletin-News Releases
[vc_row thb_full_width=”true” thb_row_padding=”true” thb_column_padding=”true” css=”.vc_custom_1608290870297{background-color: #ffffff !important;}”][vc_column][vc_row_inner][vc_column_inner][vc_empty_space height=”20px”][thb_postcarousel style=”style3″ navigation=”true” infinite=”” source=”size:6|post_type:post”][vc_empty_space height=”20px”][/vc_column_inner][/vc_row_inner][/vc_column][/vc_row]

Environmental Assessment Bulletin-News Releases

The Honourable Bernard Davis has announced the following events related to Part 10 Environmental Assessment of Environmental Protection Act.

REGISTERED UNDERTAKINGS

Deer Lake Municipal Park and Campground (Reg. 2194)
Proponent: Deer Lake Park Limited

The proposal is to expand the existing municipal campground and RV park located in the Town of Deer Lake. Park expansion would include the creation of a 3.6-hectare section within the existing park; an additional 9.7-hectare parcel adjacent to the park; as well as the 10.1-hectare island at Humber River’s mouth. Accommodations include RV sites, tenting areas, cabins, geodesic domes, treehouses, and geodesic domes. The work would include tree clearing, the installation of infrastructure for electricity, water, and sewer services, as well construction of access roads to the island and a suspension bridge. The work would be completed over two phases in 2022 and 2026. A description of the project can be found on the departments webpage at www.gov.nl.ca/eccm/env-assessment/projects-list/.

The undertaking was registered April 13, 2022. Public comment is due May 19, 2022. The minister’s decision is due May 28, 2022.

Middle Brook Fishway Refurbishment (Reg. 2195)
Proponent: Department of Fisheries and Oceans Canada

The proposal is to renovate an existing fishway in Middle Brook at Gambo, to allow for continued operation and salmon migration upstream to their spawning grounds. Construction activities include new water control structures, refurbishment and replacement of damaged fishway walls, as well as the replacement of the concrete stop log sill. A description of the project can be found on the departments webpage at www.gov.nl.ca/eccm/env-assessment/projects-list/.

The undertaking was registered April 13, 2022. Public comment is due May 19, 2022. The minister’s decision is due May 28, 2022.

ENVIRONMENTAL IMPACT STATEMENT REQUIRED

St. Lewis River Atlantic Salmon Habitat Enhanced Project (Reg. 2032)
Atlantic Rivers Outfitting Company

The minister advised the applicant that an environmental impact report (EIS) be prepared.
The project will require additional information. Additional information is required to inform the minister.
The following are some of the details, including but not limited to: purpose and rationale of the project; potential impacts on existing upstream species, habitat, and a quantitative assessment of salmon and other species; details of fishway design; plans for long term monitoring, maintenance and contingencies, including financial considerations; and, location of human receptors as well as potential effects on traditional land-use and resource activities. The minister will be assisted in the preparation of the EIS by an Environmental Assessment Committee (EAC). This committee will provide technical and scientific advice. The draft guidelines will be available for public comment. Brenda Rowe can be reached at (709) 729-2553, or email [email protected] for more information about this project.

UNDERTAKINGS WITHDRAWN:

Come By Chance Refinery Delayed Cooker Project
Proponent: NARL FUELS LP (Reg. 2037)

Chance Refinery Crude Efficiency Project and Flexibility Project
Proponent:
NARL Refining Limited (Reg. 2042)

Learn more
Environmental Assessment Division
Department of Environment and Climate Change
West Block, Confederation Building
P.O. Box 8700, St. John’s, NL A1B 4J6

Public comments may be forwarded to: [email protected]

You can find information about environmental assessments at:

www.gov.nl.ca/ecc/env-assessment/

www.gov.nl.ca/ecc/files/GUIDE-TO-THE-PROCESS_Dec2021

Follow us on Twitter: @GovNLAnd @ECC_GovNL

If you have comments to make on a project under environmental assessment, please inform the Department if you do not wish to share them with the project proponent.

Media contact
Lynn Robinson
Environment and Climate Change
709-729-5449; 691-9466
[email protected]

 

 

2022 04 14
4:20 p.m.

View Comments (0)

Leave a Reply

Your email address will not be published.